home
contact
FAQs
corporate login
 
         
 
 
       
 
home >> Industrial Parks >> Different Industrial Parks >> Plasto Steel Park, Barjora
PLASTO STEEL PARK, BARJORA
Plasto Steel Park, Barjora
Latitude, Longitude - 23.43718, 87.25307 (Click to view map)
Location : Barjora, District - Bankura, West Bengal, India
 
The fully integrated industrial park, promoted by WBIDC has been set up for steel and plastic industries. The 1st phase of the park spans an area of 190.07 acres of land in Mouzas – Kadasole, J. L. No 22, Namobandh Sitarampur, J. L. No 25 and Ghutgoria, J. L. No 24 under Barjora PS in Bankura district
 
 
Advantage Bengal
The first commercial blast furnace in India was set up in 1875 at Bengal Iron Works in Burdwan district, and it heralded the commencement of steel industry in the State. The other advantages of Bengal are
Excellent port facilities with comprehensive cargo handling facilities and competitive rates of freight
Proximity of raw materials
Availability of labour force skilled in operating iron and steel units
Easy availability of industrial water
Good forward and backward linkages
Wide market for end products
An Ideal Location
Barjora lies close to the Damodar river in Bankura district of West Bengal which is a major upcoming center for industries. It is flanked by Bardhaman in the North, Purulia in the West and Paschim Medinipur in the South. The park is
Ideally located at a motorable distance of approximately 12 km from Durgapur Railway station and very close to NH2
Nearest port – Kolkata and also very close to Haldia Port.
Nearest Airport – Netaji Subhas Chandra Bose International Airport, Kolkata
 
Park Information
Park Area – 190.07 acres in the 1st Phase and 194.168 acres in the 2nd Phase
A further area of 48.57 acres situated between the 190.07 acres and 194.168 acres has been procured for development of phase-III.
 
Infrastructural Facilities
The park has 12 m wide metalled roads.
DVC has set up an exclusive 220 MVA distribution power sub station.
The drainage facility has been developed along the road sides.
 
Park Layout
 
Functional Units
Functional Units in Phase I
M/s Anandabazar Patrika Pvt Ltd
M/s Pratyaha Newspaper Pvt Ltd
M/s X Pro India Ltd
M/s Timespac Ltd
M/s Nilkamal Plastics Ltd
M/s Surya Alloy Industries Ltd
M/s Tulip Fabrics Pvt Ltd
M/s Steelex Electrocast Pvt Ltd
Functional Units in Phase II
M/s HP Ispat Pvt Ltd
M/s Jain Spun Industries Pvt Ltd
M/s G&A Metals Pvt Ltd
M/s Lalwani Industries Ltd
 
Expected Employment
Phase I
1700 direct employees
3000 indirect employees
Phase II
4500 direct employees
8800 indirect employees
Plots Available
Plot Details
Sl. No. Master Plot No. Area in acre (More or Less)
1 C1 6.11
2 V 2.40
3 Q 3.40
Allotment of Land
Interested entrepreneur can apply to WBIDC for allotment of land in the Declaration of Intent format.
Procedure of allotment of Land
 
Location of Vacant Plots
 
Terms & Conditions of Allotment
 
Interested Investors may contact:

1. Mr. P. Kamalakanth I.F.S
Executive Director,
Phone : 033 - 22553797 / 3802
E-mail: p.kamalakanth@wbidc.com

2. Mr. Ashis Chakraborty
Deputy General Manager
Phone : 033 22553707 (D) / 22553700 -705, Extn. : 165
Email : ashis.chakraborty@wbidc.com

3. Mr. Prasun Nayek
Executive Assistant
Phone : 033-22553749
E-mail : prasun.nayek@wbidc.com

4. Oindrila Bose
Executive Assistant
Phone : 033-22553752
E-mail : oindrila.bose@wbidc.com

5. Mr. Amit Das
Executive Assistant (Industrial Park-Site)
Phone : 9735877455
E-mail : amit.das@wbidc.com

West Bengal Industrial Development Corporation Limited,
"Protiti",
23, Abanindranath Tagore Sarani, (Camac Street)
Kolkata - 700017,
West Bengal, India
 
<< Back >>
 
 
© 2006, WBIDC
Powered by WDC